Imagine going to your boss with news of a delayed project or cost overrun, and hearing "thank you" in response. 你去找老板,告诉他项目被延误或者成本超支,得到的回应却是“谢谢你”,你能想象这样的情景吗?
What is your average cost/ schedule overrun? 您的平均成本或进度超出是什么?
Now, don't ask me what's the cost and time overrun in LCA. That's another billion-dollar question. 现在不要问我LCA的费用和时间超出预算,那是另一个数十亿美元的问题。
The university faced a cost overrun on account of miscalculation. 大学经费超支是因为预计错误。
The paper, focusing on the problem of cost overrun of a project, adds managerial flexibility value to project management to have project cost controlled finally with considering the actual performing of a project. 针对项目成本超支问题,考虑项目的实际运作,将管理弹性的价值添加到项目管理中,力求更好地估计项目成本,最终使项目成本得到控制。
Through emphasizing the "human" factor in cost control, the paper discusses resolving project cost overrun of a project by applying a reaction control mechanism with the given ways to run the project to develop a better method of project cost estimate. 抓住成本控制中“人”的因素,在给定项目运作方式的基础上,采用反应控制机制,得到更好的项目成本估算,有效地解决项目成本失控问题。
In our country, construction projects are carried on by a series of serial steps rigidly, and the lack of integration of these steps can result in the delay of project and cost overrun. 在我国,工程项目建设严格遵循着一系列串行的步骤,建设步骤的严格阶段性会导致工程项目的延期和成本超支。
Project construction is a kind of business which full of uncertainties and general risks. It is prevalent that the cost overrun, schedule delay, quality and safety problems, a lot of complains, claim for compensation and lawsuit, etc. existed in the project construction. 工程承包是一个充满不确定性和综合风险的事业,工程项目成本超限、工期延长、质量和安全问题、较多的抱怨、索赔和诉讼等,是工程建设中屡见不鲜的事件。
But, according to some investigations on cost management of construction projects, there are at large and even very severity cost overrun risks, which are general estimates over rough estimates, budgetary estimates over general estimates and final accounts over budget. 但从近些年来的相关调查发现,在我国建设项目成本管理中存在普遍而且非常严重的三超(概算超估算,预算超概算,决算超预算)问题。
According to the limitation on the amount of data of a single message, at the same time under the premise of considering communication cost and communication real-time, proposed the catenary on-line security monitoring overrun judgment cycle and the data sent cycle. 并根据单条短信对数据量的限制,在同时考虑通信成本和通信实时性的前提下,确定了接触网安全状态在线监测的超限判断周期与数据发送周期。
Secondly, we divided the duration risk and cost risk into five different levels qualitatively according to the probability of schedule, cost overrun and the loss. 其次,通过研究项目出现超期、超支的可能性与损失大小定性地把项目工期和成本风险分成了Ⅰ-Ⅴ级的风险级别。
Because managers are unable to change the overloading completely, together with the high cost of governing the overload and overrun vehicles, so some related departments are put forward the advice of improving the current vehicle load level. 由于无力彻底改变超限超载情况,加之治超成本过高,于是相关部门提出了提高现行车辆荷载等级的建议。